What if there is no provision done previously for installing an UPS?

Oct 21 2016
0 Comments

slide2
If the provision of installing an inverter is not done (like shown in the earlier picture)

We need to pull a wire externally from the MCB box to the place where the UPS has to be installed.

A small 15A Switch and Socket Box has to be fixed near the UPS and the other end of wire coming from the MCB box is connected to it.

At the time of installing the UPS, we identify and isolate the Heating Devices by connecting the ups to lighting Circuits only.

In some cases, Heating and Lighting is Mixed in some parts of the Home at a time of construction, Customers need to manual Switch off those devices

Was this answer helpful ? Yes (0) / No (0)